Currency rates from 04/10/2024
$1 – 12741.02
UZS – -0.13%
€1 – 14062.26
UZS – -0.45%
₽1 – 134.38
UZS – -0.5%
Search
Uzbekistan 25/10/2023 The progress of preparations for the autumn/winter season checked
The progress of preparations for the autumn/winter season checked

Tashkent, Uzbekistan (UzDaily.com) -- Preparations are underway throughout the country for the autumn/winter season. Utility networks are being repaired, and heat supply enterprises are being modernized.

During a trip to Kashkadarya, President Shavkat Mirziyoyev visited the new central boiler house of the regional state unitary enterprise “Issiqlik Manbai” in Karshi.

This complex has a heat generation capacity of 12 Gcal. Three boilers with a capacity of 14 MW each imported from Türkiye are installed here. Due to this, it will be possible to save 1.7 million cubic meters of natural gas per year.

During the construction of the boiler house, a six-kilometer pipeline was connected to it. Heat exchangers are transferred to a closed system and are protected from losses.

The commissioning of this complex will provide hot water and heat to more than one and a half thousand apartments in 38 multi-storey buildings and three social facilities.

The Head of state instructed responsible persons to carry out high-quality preparations for winter, stabilize energy and heat supplies, and improve the culture of careful consumption.

Shavkat Mirziyoyev also visited the “Navo” mahalla, where the boiler house is located.

 

Stay up to date with the latest news
Subscribe to our telegram channel