Currency rates from 03/10/2024
$1 – 12757.94
UZS – 0.14%
€1 – 14125.59
UZS – -0.92%
₽1 – 135.06
UZS – -1.29%
Search
Uzbekistan 28/12/2023 Temporary shutdown of hot water and heating in some locations of Chilanzar district
Temporary shutdown of hot water and heating in some locations of Chilanzar district

Tashkent, Uzbekistan (UzDaily.com) -- Due to emergency work on heating networks and replacement of related equipment on Zargarlik Street, today, on 28 December, the supply of hot water and heating to the following addresses is temporarily suspended:

Chilanzar district: block 20, st. Sugali ota, Algorithm massif, Kizil Shark, Gulistan massifs and block 19 (partially).

The supply of hot water and heating will be restored as soon as emergency work is completed (approximately by 19.00 today).

Veolia Energy Tashkent apologized in advance for the temporary inconvenience and is taking all necessary measures for the speedy restoration of the supply of hot water and heating.

 

Stay up to date with the latest news
Subscribe to our telegram channel