Currency rates from 11/10/2024
$1 – 12768.30
UZS – -0.08%
€1 – 13960.86
UZS – -0.37%
₽1 – 131.15
UZS – -0.33%
Search
Uzbekistan 19/05/2023 Part of Sadyk Azimov Street partially blocked
Part of Sadyk Azimov Street partially blocked

Tashkent, Uzbekistan (UzDaily.com) -- At present, the Tashkent city branch of JSC Hududiy elektr tarmoqlari is carrying out large-scale reconstruction and construction works to ensure the continuous and stable operation of the power supply system of our capital.

As part of the work, the construction of a new power grid along Amir Temur Street has begun. In this regard, from 19 May until the completion of construction work, one lane of the road on Sadyk Azimov Street from the intersection with Nukus Street to the intersection with Shakhrisabz Street will be temporarily blocked.

In connection with the overlap, bus routes are changing.

“In connection with the unannounced blocking of the street named after Sadyk Azimov from school 145 to the intersection with Amir Timur Avenue, the transport passing through this section of the road makes a detour. These are buses of the following routes: 16, 26, 37, 80.

 

Stay up to date with the latest news
Subscribe to our telegram channel