From 10 September, Road in Sergeli District to Be Closed for Heating Network Repairs — UzDaily.uz
Currency rates from 10/09/2025
$1 – 12355.14
UZS – -0.68%
€1 – 14539.53
UZS – -0.3%
₽1 – 148.48
UZS – -2.23%
Search
From 10 September, Road in Sergeli District to Be Closed for Heating Network Repairs

From 10 September, Road in Sergeli District to Be Closed for Heating Network Repairs

From 10 September, Road in Sergeli District to Be Closed for Heating Network Repairs

Tashkent, Uzbekistan (UzDaily.com) — Veolia Energy Tashkent has announced upcoming replacement work on the heating networks in the Sergeli district of the capital.

The work will take place on Kumarik Street as part of preparations for the 2025–2026 autumn-winter season. A section of the heating network with a diameter of 325 mm and a total length of 1,000 meters is scheduled to be replaced.

According to the information provided, the contractor will begin work on 10 September and complete it by 30 September. During this period, the roadway will be closed.

Access will still be maintained for staff of freight units, the Aviation Security Service, airport personnel, emergency and rescue services, as well as residents of nearby buildings.

Stay up to date with the latest news
Subscribe to our telegram channel