Overhaul of the main heat pipe to be held in Almazar district
01/07/2020 18:25
Overhaul of the main heat pipe to be held in Almazar district
01/07/2020 18:25
Tashkent, Uzbekistan (UzDaily.com) -- As part of preparations for the autumn-winter period 2020-2021, from 2 July, overhaul of the main heat pipe that runs along small ring road street in Almazar District will begin - from its intersection with Farabi Street direction to Beruni street, the city khokimiyat reports.
This main heating network was built in 1986, over the past 3 years in its part, where repairs will be carried out, more than 30 emergency situations have occurred. Repair work will continue for 14 days - without disconnecting the population from hot water supply.
In the course of the Small Ring Road, in the direction from Beruni Street to the intersection with Farabi Street, it will be partially closed, the movement of vehicles will take place on one side of the Moscow Ring Road, divided into two parts.
In this regard, the khokimiyat recommend that drivers use bypass routes to avoid possible traffic jams.
18/04/2024Read more
18/04/2024Read more
$ 1 | 12667.00 | +0.022% |
1 | 13481.49 | -2.022% |
₽ 1 | 135.77 | -0.506% |