A large project of domestic industry to be implemented on the basis of Tebinbulak
20/08/2019 21:45
A large project of domestic industry to be implemented on the basis of Tebinbulak
20/08/2019 21:45
Tashkent, Uzbekistan (UzDaily.com) – President of Uzbekistan Shavkat Mirziyoyev got acquainted with the construction project of a mining and metallurgical complex based on the Tebinbulak deposit in Karauzyak district.
The raw material reserve of the field is estimated at 1.1 billion tonnes. According to preliminary estimates, it is planned to mine 33 million tonnes of ore per year and get 1.5 million tonnes of iron from it.
Measures for the implementation of this investment project were determined by a resolution of the head of state of 12 January 2018.
The mining and metallurgical complex will have an annual production capacity of 900,000 tonnes of fittings, 225,000 tonnes of wire, 375,000 tonnes of corners, channels and other materials. The implementation of the project will contribute to the replacement of a significant volume of imports and the sustainable development of industry. The complex will provide work for more than 2,000 people. It is planned to export 35 percent of the products.
The companies "DMT-Group Consulting" (Germany) and "Horst Wiesinger Consulting" (Austria) were involved in the preparation and implementation of the project.
The President talked with specialists from these companies, noted the need to apply advanced scientific achievements in the construction of the complex, and to create a scientific and practical school in the field of production of iron products.
The head of state gave instructions on developing a deeply thought-out feasibility study for the project, attracting mainly young people to its implementation.
$ 1 | 12667.00 | +0.022% |
1 | 13481.49 | -2.022% |
₽ 1 | 135.77 | -0.506% |